List of projects for '2024' (Approximate Occupancy date)

Total Count of Projects: 57
< Previos12345678Next >

Address: Postridge Drive & Dundas Street East, Oakville, ON

Approximately occupancy date:2024

Building size: 8

Builder: Greenpark

Project Description:

The Post is a new condo development by Greenpark Group currently in preconstruction at Postridge Drive & Dundas Street East, Oakville. The development is scheduled for completion in 2024. The Post unit sizes range from 473 to 843 square feet.

 

Address: 6036 Campbellville Rd Milton, ON L9T 2N7

Approximately occupancy date:2024

Building size:

Builder: Royalpark Homes and Canvas Developments

Project Description:

This collection of townhomes and detached homes in Milton is for families who thrive on access to breathtaking natural spaces. Located within walking distance of Kelso Park, families will be able to enjoy year-round recreation including swimming, camping, skiing and tobagganing within the neighbourhood borders.

 

Address: 30 Bristol Rd East Mississauga, ON L4Z 3K8

Approximately occupancy date:Fall 2024

Building size: 24

Builder: Marlin Spring Developments and RioCan Living

Project Description:

Above Condos is a new condo development by Marlin Spring and RioCan Living currently in preconstruction at 30 Bristol Road East, Mississauga. Above Condos has a total of 510 units.

 

Address: 310 Erb St West Waterloo, ON N2L 1W3

Approximately occupancy date:2024

Building size: 6

Builder: Urban Legend Developments

Project Description:

Introducing Moda Condos, a stunning new development coming soon to Waterloo! Featuring a highly desirable location near Erb St W & University Ave W, residents at Moda will find themselves surrounded with a number of sought after amenities

 

Address: 151 City Centre Dr Mississauga, ON L5B 1M7

Approximately occupancy date:June 2024

Building size: 31

Builder: Camrost-Felcorp

Project Description:

Exchange Signature Residences is a new condo development by Camrost Felcorp currently in preconstruction at 151 City Centre Drive, Mississauga. The development is scheduled for completion in 2024. Exchange Signature Residences has a total of 250 units. Sizes range from 555 to 888 square feet.

 

Address: 20 Queen St North Kitchener, ON N2H 2G8

Approximately occupancy date:2024

Building size: 34

Builder: Fusion Homes

Project Description:

Q Condos is a new condo development by Momentum Developments currently in preconstruction at 20 Queen Street North, Kitchener. Q Condos has a total of 239 units.

 

Address: 93 Arthur St South Guelph, ON N1E 5K2

Approximately occupancy date:2024

Building size:

Builder: Fusion Homes

Project Description:

Anthem at The Metalworks is a new condo development by Fusion Homes currently in preconstruction at 93 Arthur Street South, Guelph.

 

Address: 699 Sheppard Avenue East, Toronto, ON

Approximately occupancy date:2024

Building size: 12

Builder: Originate Developments Inc and Harlo Capital

Project Description:

Six99 is a new condo development by Originate Developments Inc. and Harlo Capital currently in preconstruction at 699 Sheppard Avenue East, Toronto. Six99 has a total of 174 units.

 

< Previos12345678Next >
ALL
The data contained on these pages is provided purely for reference purposes. Due care has been exercised to ensure that the statements contained here are fully accurate, but no liability exists for the misuse of any data, information, facts, figures, or any other elements; as well as for any errors, omissions, deficiencies, defects, or typos in the content of all pre-sale and pre-construction projects content. All floor plans dimensions, specifications and drawings are approximate and actual square footage may vary from the stated floor plan. The operators of these web pages do not directly represent the builders. E&OE.
Please note that content and information contained in this website is for demonstration purposes only and this website is trial website or test website and it can not be used for marketing purposes.